Portland Kitchen Remodel Checklist

Everything you need to decide, confirm, and prepare before demo day — and what to track while work is underway.

Talk to a Licensed Contractor — (971) 535-8286

✓ Licensed & Insured   ✓ Permits Handled In-House   ✓ Free Quote

★★★★★
Same-Week Estimates
No Surprise Fees
CCB Licensed & Insured
Phase 1 — Before You Talk to Anyone

What to Know Before the First Conversation

The decisions you make in this phase set the conditions for every contractor conversation you’ll have. Get these right and you’ll be able to compare quotes honestly and spot problems early.

Write down what’s actually wrong with your kitchen

Not what you want it to look like — what specifically doesn’t work. Traffic flow. Not enough counter. Cabinets you can’t reach the back of. This list becomes the brief that every contractor quotes from. Without it, you’ll get wildly different scopes and no way to compare them.

Set a real budget range — not a wish number

A Portland kitchen remodel that touches layout, plumbing, and electrical typically starts around $45,000–$55,000. Add 10–20% contingency for a home built before 1960. If your budget is $18,000, a contractor should tell you that upfront rather than quote a scope that doesn’t match reality. See our cost guide for what drives pricing.

Decide whether you’re open to structural changes

Removing a wall between the kitchen and dining room changes the project scope, permit requirements, and budget significantly. Knowing your position on this before contractor conversations saves everyone time. If you’re unsure, ask each contractor to show you both options.

Check whether your home is in a Portland historic district

Homes in designated historic overlay zones have additional design review requirements through the Bureau of Development Services. This affects exterior changes and sometimes interior structural work. Look up your address at portland.gov before getting any quotes.

Phase 2 — Hiring the Right Contractor

What to Verify Before You Sign Anything

This is where most Portland homeowners skip steps and pay for it later. See our full guide on how to hire a kitchen contractor in Portland for the complete process.

Verify CCB license at oregon.gov/CCB — confirm it’s active

Check license status, expiry date, and complaint history. Takes two minutes and tells you more than any review platform. A contractor without an active CCB license cannot legally pull permits for your job.

Get at least three quotes — all quoting the same scope

Ask each contractor to break their quote down line by line. A quote that says “kitchen remodel — labor and materials” and one number is not a quote you can hold anyone to. If one quote is 40% lower than the others, ask specifically what they’ve left out.

Confirm the contract has a written change-order clause

No additional work should proceed without your written approval and a signed change order with a stated cost. This is the clause that prevents the “we opened the wall, it’ll be $6,000 more, and we already did it” situation.

Confirm who pulls the permits and manages BDS

Portland’s Bureau of Development Services issues the permits and schedules inspections. Your contractor should handle this process entirely — if they suggest you pull your own permits as a homeowner to save money, that transfers liability to you. See our permits guide.

Call three references from completed Portland projects

Ask each reference: did the project come in near the quoted price, were there surprises, was communication reliable, and would they hire this contractor again. Reviews tell you what people were willing to say publicly. A phone call tells you what actually happened.

Phase 3 — Design Decisions

Finalize These Before Demo Starts

Every item below needs to be decided before demolition begins. Changes made after rough-in is complete almost always trigger change orders — sometimes significant ones.

Cabinetry
  • Brand and product line selected
  • Door style and finish confirmed
  • Hardware style and finish selected
  • Interior fittings decided (pull-outs, lazy susans, drawer inserts)
  • Measurements verified against final layout plan
Countertops
  • Material selected (quartz, granite, butcher block, etc.)
  • Color and pattern confirmed from actual slab, not sample
  • Edge profile decided
  • Seam locations reviewed and approved
  • Template date scheduled (usually after cabinet install)
Plumbing Fixtures
  • Sink type and bowl configuration selected
  • Faucet model confirmed (verify hole count matches sink)
  • Disposal make and model specified
  • Sink location in cabinet run finalized
  • Dishwasher placement confirmed
Appliances
  • All appliance models specified with exact dimensions
  • Range type confirmed (gas, electric, induction) — affects rough-in
  • Refrigerator depth confirmed (counter-depth vs. standard)
  • Range hood type selected (recirculating vs. vented)
  • Delivery date coordinated with install schedule
Electrical & Lighting
  • Recessed light locations marked on plan
  • Under-cabinet lighting decided (wired vs. plug-in)
  • Pendant light locations over island or peninsula confirmed
  • Outlet locations reviewed (especially for countertop appliances)
  • USB/USB-C outlet locations decided if wanted
Flooring & Finishes
  • Floor material and color selected
  • Direction of floor run confirmed
  • Backsplash material, tile size, and pattern decided
  • Grout color selected
  • Paint color confirmed (after cabinets are selected, not before)
Phase 4 — Before Demo Day

Practical Prep for the Week Before Work Starts

Set up a temporary kitchen space

Microwave, electric kettle, coffee maker, and a hot plate in a spare room or basement. A mini-fridge if you don’t have room for the main refrigerator in a usable location. You’ll use this for 6–12 weeks minimum — it’s worth setting it up properly.

Clear and store everything from the kitchen

Dishes, food, small appliances, cleaning products, everything. Label boxes by category so you can find things during the project. Items left in the kitchen during demo are at risk and create scheduling conflicts.

Photograph everything in the existing kitchen

Every cabinet, every wall, every corner. Your phone photos are time-stamped evidence of the condition of the space before work started. Useful if any dispute arises about pre-existing conditions vs. project damage.

Confirm permit status with your contractor

Portland’s BDS should have issued or at minimum approved the permit application before demo starts on any work requiring permits. Ask for the permit number and confirm it’s been issued, not just applied for. Unpermitted work discovered later is significantly more expensive to fix.

Plan for dust containment

Kitchen demo in an occupied home generates significant dust and debris. Ask your contractor how they plan to seal off the work area from the rest of the house. In older Portland homes with forced-air HVAC, dust gets everywhere fast. Temporary plastic sheeting across doorways is a minimum expectation.

Phase 5 — During Construction

What to Track While Work Is Underway

This is the phase where small miscommunications become expensive if they’re not caught early. These are the things worth checking regularly.

Confirm all inspections are scheduled and passing

Rough electrical, rough plumbing, and structural work all require BDS inspections before they can be closed in. Ask your contractor for the inspection record as each phase completes. A missed inspection that gets discovered at final is a real problem.

Review and sign every change order before work proceeds

If a wall opens up and reveals a condition that changes the scope, your contractor should stop, document it, and get your written sign-off before proceeding. If they don’t, ask for this in writing immediately — not after the work is done.

Confirm material deliveries against your spec sheet

When cabinets, countertop slabs, tile, and appliances arrive — verify they match what you ordered. It’s far easier to correct a wrong delivery before installation than after. Check quantities too.

Make payments tied to milestone completion — not calendar dates

Your contract should have a payment schedule based on what’s been completed: permit issued, rough-in passed inspection, cabinets installed, etc. Never pay ahead of completed work except for the initial deposit.

Questions

Frequently Asked Questions

What should I do before a kitchen remodel starts?

Confirm your contractor’s CCB license, have a signed contract with a line-itemized scope and a written change-order process, verify permits are issued (not just applied for), set up a temporary kitchen, clear everything from the space, and photograph the existing kitchen thoroughly. For older Portland homes, budget a 10–20% contingency above the quoted cost.

How do I prepare my kitchen for demo day?

Clear all cabinets and counters at least a week before. Move small appliances, dishes, food, and everything personal into temporary storage. Set up a microwave and hot plate in another room. Cover doorways with plastic sheeting to contain dust. Photograph every corner of the existing kitchen for your records.

What decisions have to be made before demo starts?

Cabinet brand, door style, finish, and hardware. Countertop material, color (confirmed from actual slab), and edge profile. Exact appliance models with dimensions. Sink type and faucet. Flooring material and direction. Backsplash tile and grout color. Lighting locations. Paint color. Changes to any of these after rough-in begins typically create change orders — sometimes large ones.

How do I know if my Portland kitchen remodel needs a permit?

Any work touching electrical, plumbing, or structural elements requires a permit from Portland’s Bureau of Development Services. Cosmetic work like painting or replacing cabinet fronts in the same location typically doesn’t. See our full Portland permits guide for what triggers a permit requirement and how the BDS process works.